Our services

Mechanical welding

MGO has many years' experience and expertise in the manufacture of boilerwork mechanical components. We guarantee a high level of welding quality, by complying with EN 3834-2 certification. Parts can weigh up to 10 tonnes.

Production of mechanical components using qualified TIG/MIG/MAG welding processes (qualification of our welders and welding procedures), coordinated by our welding engineer and in compliance with EN ISO 3834:2 certification.

 

BOX Inox MGO

A team of ten welders qualified in several welding processes (TIG, MIG, MAG).

An IWE welding engineer to coordinate welding, and a welding workshop manager.

IMG_6009_OK
  • A team of welders qualified in various processes (TIG/MIG/MAG)
  • Rain welds
  • A stainless steel welding area totally isolated from the boiler making workshop, to ensure no pollution.
  • The design of our welding fixtures
  • Welding supervision by our welding engineer
  • Touring to extend the production range
ISO 3834-2 certification
ISO 9001 certification
ISO 19443 certification

Achievements

Bracket Inconel
Sector of activity : Energy gas
Materials : Inconel
Oil collection tank
Sector of activity : Hydropower
Materials : Carbon steels
Transport and handling cage
Sector of activity : Energy gas
Materials : Carbon steels
Aluminium 5083 protective cover + welds
Sector of activity : Oil industry
Materials : Aluminium

Request a quote

Do you have a project? A part to be machined, a series to be produced, or a specific technical requirement?

Fill in the form below and our team will get back to you as soon as possible with a personalised proposal.

What you can send us:

Technical drawing or 3D file (DXF, STEP, PDF...), Desired quantity (prototype, small or large series), Expected lead time, Any information useful for studying your request.

Need advice or a direct discussion?
📞 Contact us directly on 03.84.26.01.30